Define the load
Oldham and Saddleworth plots can differ sharply in gradient and access, so the project must be assessed from measured site evidence.

Foundation system supply · Greater Manchester
Ground screws are a design decision, not a postcode product. Start with the structure, loads, ground, services, levels and access before comparing quotations.
Oldham and Saddleworth plots can differ sharply in gradient and access, so the project must be assessed from measured site evidence.
Include a level survey or clear level information, structure plan, utility checks, drainage, boundaries and the narrowest equipment access.
For Oldham, delivery and approved-contractor availability are confirmed from the full address, project scope and access information.
A screw count or unit price alone does not show whether two quotations carry the same design, connection, installation, verification and handover responsibilities.
Send the project briefStructure, design loads and load paths
Ground information and design assumptions
Screw type, length, finish and head connection
Quantity, setting-out plan and finished levels
Buried-service checks and exclusion zones
Plant access, installation and verification method
Engineering and Building Regulations responsibility
Delivery, waste, reinstatement and exclusions
The page covers Oldham, Saddleworth, Shaw, Royton, Failsworth and relevant OL1, OL2, OL4, OL8, OL9 addresses. Coverage means Forti Nova can review the enquiry; it is not a claim that one foundation design suits the whole area.
Unknown services, uncontrolled fill, obstructions, contaminated ground, inadequate access or an undefined load path require further investigation or a revised foundation approach before installation.
Yes. Send the structure or base plan, intended use, site photographs, levels, access and full Oldham delivery address. Forti Nova can then confirm the supply and approved-contractor route.
No. Suitability depends on the structure, loads, ground conditions, buried services, drainage, levels, access and the design method. Unsuitable or uncertain ground requires further investigation or another foundation approach.
It should state the screw specification, quantity, layout, connections, design assumptions, installation and verification method, engineering responsibility, delivery, exclusions and who signs off each stage.
Forti Nova supplies systems and can route suitable projects to trained approved contractors. The written quotation must identify the contractor and the responsibilities for design, service checks, installation, records and handover.
Send the structure plan, loads where available, site photographs, levels, access and full address. Forti Nova will confirm the applicable system supply and approved-contractor route.